Thursday, April 9, 2020

Starting phase 2 of the kitchen

We're launching into a kitchen remodel, phase 2. It starts with before pictures


The smallest piece of cabinet ever



This green inside paint is actually the new color - I was late




These cabinets are also supposed to get the same upgrades




The plan for this phase is pretty straightforward. We want to replace the tile countertops with butcher block, that is the part that takes the most work for me. We are also going to paint the cabinets and change out the cabinet hardware. The sink is pretty beat up too, so we're looking at a single basin undermount model and a new faucet as well. Fancy stuff there! We're going to finish it off by replacing that mirror backsplash with some ceramic tile.

First step for me is to glue up the countertops. Got to get those formed and ready to install. Then, demo of those tile. Kelley has hated the tile since we moved in here 10 years ago and really wants something flat. This is going to be a ride.

No comments:

Post a Comment